Common Mistakes to Avoid in Piping Design Reviews
Common Mistakes to Avoid in Piping Design Reviews
II JAY SHRI KRISHNA II
The Hidden Perils of Piping Design
In the world of industrial engineering, a piping design review is a critical checkpoint—the final safety net before blueprints become reality. A well-executed review is the difference between a project that runs smoothly and one plagued by costly delays, safety hazards and rework. However, even the most experienced teams often fall victim to subtle yet significant oversights. These "project saboteurs" can turn a seemingly perfect design into an operational nightmare.
![]() |
Common Mistakes to Avoid in Piping Design Reviews |
This post will highlight the most common oversights made during piping design reviews. We’ll go beyond just listing the problems, offering insights into why they occur and providing actionable advice on how to prevent them, transforming a routine checklist into a strategic advantage for any project.
Why Piping Design Reviews Are So Crucial
A piping design review is far more than a formality. It's a comprehensive risk-mitigation strategy where a team of experts scrutinizes every detail to ensure:
- Operational Safety: Verifying that a layout won't pose a risk to personnel or equipment.
- Code Compliance: Adhering to strict industry standards (such as ASME, API, and NFPA) to ensure the design is in full compliance.
- Maintenance & Accessibility: Confirming that the plant is not just built, but can be easily operated and serviced.
- Cost-Effectiveness: Catching errors that would be exponentially more expensive to fix during fabrication or construction.
Ignoring or rushing this phase is a direct invitation for trouble. A simple oversight can lead to a domino effect of issues that are much harder and more expensive to correct later on.
Common Mistakes to Avoid in Piping Design Reviews
1. Overlooking the Equipment Layout Check
It's one of the most common and foundational mistakes. Designers can become so focused on pipe routing that they neglect to confirm the accurate placement and orientation of the equipment itself.
![]() |
Improper Equipment Layout |
- Dangers of This Mistake: Failing to confirm equipment layout can lead to nozzle misalignments, forcing costly rework and re-fabrication of spools. It can also result in inadequate space for routine maintenance, such as pulling a pump motor or a heat exchanger tube bundle, which creates long-term operational headaches. Incorrect orientation can also disrupt process flow and compromise equipment performance.
- How to Master the Check: The reviewer must act as a detective, cross-referencing the piping model against the latest vendor GA (General Arrangement) drawings and data sheets. Ensure that the nozzle orientations, bolt circle diameters and the equipment's complete measurements are accurate. Visually inspect the 3D model to ensure clear access for cranes, forklifts, and maintenance personnel.
2. Ignoring Pipe Stress Analysis Results
A piping system is a living entity; it expands with heat and contracts with cold. The inability to account for these movements is a direct path to a major failure.
![]() |
Ignoring Pipe Stress Analysis |
- Dangers of This Mistake: The absence of proper stress analysis is a common cause of system-wide catastrophes. Overloading can lead to the failure of equipment nozzles or harm the integrity of pump casings. Inadequate flexibility can cause pipe rupture or thermal buckling. This oversight is also the primary cause of fatigue failure from constant vibration.
- How to Master the Check: Don't just assume stress is covered. Review the stress analysis report for all "critical lines" (e.g., high-temperature, large-diameter, or vibration-prone lines). Verify that the chosen pipe support types (e.g., springs, guides, anchors) and their locations match the analysis recommendations. Visually confirm that stress loops or expansion joints are correctly sized and routed to provide sufficient flexibility.
3. Neglecting Accessibility and Maintenance Considerations
The most beautiful layout is worthless if a valve cannot be operated or a bolt cannot be reached. This mistake often stems from a focus on engineering efficiency over practical operability.
![]() |
Valve Accessibility Issues |
- Dangers of This Mistake: Placing manual valves at unreachable heights forces workers to use ladders, increasing safety risks. Instruments hidden behind pipe clusters become difficult to read or calibrate. Lack of platforms or ladders means routine tasks can only be performed with scaffolding, adding time and cost to every maintenance activity.
- How to Master the Check: Adopt a "day in the life" mindset. Imagine an operator or maintenance technician trying to perform a task. Use the 3D model to simulate scenarios like pulling a filter element or opening a valve. Ensure a clear path exists to every piece of equipment and instrument, following company accessibility standards for clearances, platform widths and ladder placements.
4. Poor Pipe Routing
Piping routing is a blend of art and science. A poor route is not just a cosmetic flaw—it directly impacts a project's budget and operational efficiency.
- Dangers of This Mistake: Longer pipes lead directly to increased expenses for raw materials, manufacturing, and insulation. A single poorly routed line can interfere with a dozen others, creating a cascade of clashes. Unnecessary bends and fittings increase friction and pressure drop, reducing pump efficiency and overall plant performance.
- How to Master the Check: Step back and visualize the entire plant layout. Are there simpler, more direct routes? Use the 3D model to identify and resolve all potential collisions. Review the P&ID for every line to confirm, the route respects the process flow. Strive for a layout that is logical and simplifies construction while keeping pipe lengths as short as possible.
5. Overlooking Safety Clearances
Safety should be non-negotiable, but human error in a fast-paced environment can lead to dangerous oversights.
![]() |
Safety Hazards (Clearances & Escape Routes) |
- Dangers of This Mistake: Routing a hot, uninsulated pipe too close to a walkway creates a burn hazard. Running process lines near electrical trays poses an explosion or fire risk. Failing to provide adequate clearance for fire vehicles or escape routes could have catastrophic consequences in an emergency.
- How to Master the Check: Always use safety standards as the leading principle when examining the design. Use checklists from regulatory bodies like NFPA, API and OSHA. Verify fire and blast clearances, minimum spacing between lines of different temperatures and ensure that all escape routes and access points are free from obstructions.
6. Improper Pipe Support Design
Pipe supports are the backbone of a piping system and neglecting them can lead to structural failure.
![]() |
Inadequate Support and Hanger Placement |
- Dangers of This Mistake: Without proper support, pipes can sag or vibrate excessively, leading to fatigue failure. Supports placed in the wrong location can put an immense load on equipment nozzles, leading to damage. Leaving supports to be designed during construction can cause massive delays as fabricators wait for details.
- How to Master the Check: Treat pipe supports as a core part of the design, not an afterthought. Ensure that the design review includes a dedicated check for support locations, types and materials. Verify that support locations are feasible with the civil/structural layout and that they can be easily fabricated and installed.
7. Neglecting Instrumentation and Control Integration
The piping system and the instrumentation system are two halves of a whole. A lack of coordination between them is a critical and common error.
- Dangers of This Mistake: Instruments can be installed in a way that makes them impossible to read or calibrate. No space for instrument impulse lines can halt installation. Poor access to transmitters and flow meters can make troubleshooting difficult and time-consuming.
- How to Master the Check: Conduct a joint review with the instrumentation and control team. Verify every instrument shown on the P&ID has a designated and accessible location in the 3D model. Ensure there is enough space to install tubing and impulse lines without clashes and that calibration ports are easy to reach.
8. Failing to Review Vendor Data
Piping drawings are often initiated before all vendor data is finalized. Using outdated or preliminary data is a high-risk mistake.
- Dangers of This Mistake: In a worst-case scenario, a pump with a different flange size than specified on the drawing will simply not fit during installation, causing project delays and cost overruns. Incorrect nozzle orientations can make a piping spool useless.
- How to Master the Check: Create a master list of all vendor data sheets. During each review session, explicitly confirm that the latest versions have been used. Any changes in a vendor's GA drawing must be immediately incorporated into the 3D model and cross-checked for clashes.
9. Overlooking Civil and Structural Coordination
The piping system must live in harmony with the plant's civil and structural components. A lack of coordination between these teams is a classic mistake.
- Dangers of This Mistake: Piping can clash with beams, columns, or platforms, requiring costly field modifications. A pipe rack designed without sufficient space for future expansion can limit a plant's growth. To avoid damage to a structure, it's crucial to account for thermal expansion when planning.
- How to Master the Check: Foster continuous, open communication with the civil and structural teams. Conduct joint 3D model reviews where all disciplines can identify clashes and coordination issues in real time. Ensure that every pipe support location has a corresponding structural member that can bear the load.
10. Rushing the Design Review Process
Project deadlines are a constant pressure, but rushing a review is a false economy.
- Dangers of This Mistake: Rushing a review is the single biggest cause of all the other mistakes. It leads to major issues being missed, forcing expensive rework and delays during construction. The cost of a few days of thorough review is minimal compared to the cost of a few weeks of fabrication delay.
- How to Master the Check: Prioritize quality over speed. Schedule reviews in stages (e.g., 30%, 60%, 90% completion) to catch errors early. Develop a comprehensive checklist and ensure every item is checked and signed off by the relevant discipline.
11. Ignoring Operability and Startup/Shutdown Procedures
A design can look perfect on paper, but if it doesn't account for how the system will be operated, it's a failed design. This oversight often occurs due to a lack of communication between the design team and the operational team.
- Dangers of This Mistake: Failing to consider how a system will be started, shut down, or put into standby can lead to dangerous pressure surges (fluid hammer), equipment damage, or even a total plant trip. Simple things like an inaccessible bypass valve or a missing drain can complicate and prolong critical operational phases, increasing risk.
- How to Master the Check: Make sure experienced plant operators are included in the initial design reviews. Their on-the-ground knowledge is invaluable. Ask them to "walk through" the process on the 3D model, pointing out any missing valves, drains, vents, or other components that are essential for safe and efficient operation.
12. Lack of Commissioning and Decommissioning Planning
The life cycle of a plant doesn't end when it's built; it begins. Failing to plan for the initial startup and the eventual shutdown of the plant is a major oversight.
- Dangers of This Mistake: Without proper planning, commissioning a new unit can be a major headache. Lack of temporary connections for flushing or steam blowing can lead to delays and potential contamination. Similarly, improper drainage provisions can make a future decommissioning process for hazardous systems extremely difficult and unsafe.
- How to Master the Check: Review the design with its entire life cycle in mind. Ensure that there are sufficient flush points, drain points and bleeders for cleaning and isolation. Think about future access needs. These small details, planned for during the review, can save a significant amount of time and money in the later phases of the project.
Conclusion:
Piping design reviews are one of the most critical steps in project execution. By avoiding the common mistakes outlined in this article, engineers can save time, reduce costs and prevent safety risks.
A successful piping design review ensures:
- Equipment is accessible and maintainable
- Piping routes are safe and efficient
- Stress, civil, and instrumentation aspects are properly integrated
- Compliance with codes and standards is achieved
Careful attention during the design review phase not only improves the quality of engineering but also builds long-term reliability and safety into the plant.
🚀 For more insights, check out these related posts:
Best Practices for Column Piping Design in Petrochemical and Refinery Projects
Process Plant Piping Design Guide: Burner, Offsite, Yard & Tank Farm
Checklist for Piping & Instrumentation Engineering Drawings Review
Piping Design Checklist for Accurate Engineering Drawings
Checklist for Civil & Structural in Piping Layouts
Checklist for Piping Engineers: Plot Plan and Equipment Layout
Advanced Offshore Piping Considerations for FPSO Vessels
Pipe to Pipe Spacing Calculator
Please like, message and share if you feel all my blogs are beneficial, useful or helpful for you and for other also.
Thank you so much for following my blog…!! 🙏
See you all in the next coming blogs till then keep exploring piping field……!!
Have a great day today.... Keep smiling 😀 and God Bless You all…!!
To be continue……